
Palma Airport Renovation Brings Upgrades Amid Works

Passengers flying through Palma de Mallorca Airport (PMI) this summer will notice ongoing renovations throughout the terminal and surrounding areas. The €559 million modernization project, launched by Spanish airport operator Aena in late 2022, aims to make the airport more passenger-friendly, efficient, and sustainable, with completion expected by the end of 2026.
Completed upgrades so far:
-
Faster security screening: A new central checkpoint on Level 2 now allows passengers to pass through without removing laptops or liquids, significantly speeding up the process.
-
Refreshed terminals: Module A, which serves non-Schengen international flights, has been renovated with brighter, more open spaces, new retail and dining areas, and dedicated walkways for arrivals, departures, and passengers with reduced mobility.
-
Digital passport control: 40 e-gates are now in operation for both arriving and departing passengers.
-
Parking expansion and solar prep: The seventh floor of the main car park has opened, adding 750 spaces and preparing for photovoltaic panels to support renewable energy use.
Ongoing and upcoming projects:
-
Main terminal: This winter will bring new escalators, lifts, extended check-in counters, reorganized airline offices, and a third security checkpoint equipped with next-gen scanners.
-
Elevated walkway: A second bridge will connect the car park to the new check-in area, easing passenger flow.
-
Commercial zone: A new fourth-floor retail area linking Modules A, B, C, and D will open fully this winter.
-
Modules A & D: Module A will gain five new jet-bridge gates, while Module D will close for a full roof, lighting, and HVAC upgrade, plus three new boarding gates.
-
Forecourt and buses: A new covered bus station and an expanded vehicle area are under construction outside the terminal.
Sustainability goals:
The renovation emphasizes efficiency and environmental responsibility. Measures include more natural light, renewable energy systems, and optimized passenger flows. Aena aims for carbon neutrality by 2026 and net zero emissions by 2030.
While construction continues, travelers may experience noise, dust, or longer walks, but they can already benefit from faster security and refreshed facilities. Extra time, attention to signage, and patience will ensure a smoother journey.